PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Ohio |
$1,250 |
$1,500 |
$1,750 |
$2,000 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Temporary |
$200 |
$1.65/sq.ft, $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.55 / UI |
$.65 / UI |
$.75 / UI |
$.45 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$30 |
$360 |
$450 |
$540 |
$630 |
$ 50 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$45 |
$65 |
$85 |
$30 |
$40 |
$50 |
$35 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$25 / Unit |
$120 |
$55 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$50 |
$50 / Unit |
$60 |
$60 / Unit |
N/A |
N/A |
$1.00
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Kwikset No. 400T, US-3, PK67767KD on front and rear entry doors. Where a lockset is not practical, use Master Padlock and Hasp (A389). On other secondary entry doors with existing deadbolt
locks, rekey to lock type 67767. Install slide bolt on any remaining secondary entry doors on the 1st floor. Resecuring of vandalized properties may be done without prior approval.
Mortgagees may use bracing to secure other doors leading to the exterior as needed. Specifically, bracing should be used only when exterior doors cannot be otherwise secured from the interior. If you have questions about when to employ bracing contact the M&M contractor.
Bracing - Cut a 2x4 inch brace board to fit between the interior doorknob and a cleat board nailed into the floor at a 45-degree angle.
If local code is different from this requirement, local code will prevail.
There is no required thickness of plywood per the guidelines. Ensure that the thickness of plywood being used is documented on the update/bid and that the corresponding allowable amount is used for bidding/invoicing purposes.
Boarding Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Debris Removal Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule
Winterize year round regardless of the month the property is secured.
Type of Service: |
Allowable Cost: |
Sump Pump |
$15 |
Pumping water from basement |
$100 |