PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
New York |
$1,250 |
$1,400 |
$1,550 |
$1,700 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Temporary |
$275 |
$1.65/sq.ft., $750 max. |
N/A |
N/A |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.65 / UI |
$.75 / UI |
$.85 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$35 |
$420 |
$525 |
$630 |
$735 |
$100 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$60 |
$80 |
$100 |
$30 |
$40 |
$50 |
$45 |
$55 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$100 |
$35 / Unit |
$160 |
$70 / Unit |
$450 |
$115 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$100 |
$49 / Unit |
$125 |
$49 / Unit |
N/A |
N/A |
$2.00
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Kwikset No. 400T, key code 44535 or equivalent on front and rear entry doors. Install Kwikset Deadbolt Lock or equivalent, key coded to 67767 (3/4” solid bolt) on main entry door if door has an existing dead bolt lock. Secondary doors on 1st floor only should be secured with slide bolt. Use Master Padlock A389 or equivalent on garage and outbuildings.
Boarding Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Debris Removal Cost Schedule
Yard Maintenance Cost Schedule
Winterize year round regardless of the month the property is secured.