PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Delaware |
$1,250 |
$1,400 |
$1,550 |
$1,700 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, |
Temporary |
$200 |
$1.65/sq.ft., $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.60 / UI |
$.70 / UI |
$.80 / UI |
$.50 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$35 |
$420 |
$525 |
$630 |
$735 |
$120 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$55 |
$75 |
$95 |
$30 |
$40 |
$50 |
$35 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$70 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$55 |
$35 / Unit |
$100 |
$80 / Unit |
N/A |
N/A |
$2.50
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install Master Lock key code to 44535 on the front and rear entry doors. On other secondary entry doors with existing deadbolt locks, re-key to lock type 44535. Where a lockset is not practical, use Master padlock A389. Install slide bolt on any remaining secondary entry doors on the first floor.
NO VARIATION FROM GENERAL REQUIREMENTS.
Boarding Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule