Back

Wyoming

PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

**Additional Amounts for Wet/Radiant Winterizations:  If a property is located in a state where winterization is required, and the property has hot water heat, add $250 per unit.
 

Denver HOC

1  Unit

2  Units

3  Units

4  Units

Wyoming

$1,000

$1,050

$1,100

$1,150

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Maximum Allowable Securing Fee

In-Ground Pools

Above-Ground

Pools

Hot-Tub, Jacuzzi, Spa

Temporary
Roof Repairs

$200

$1.65/sq.ft., $750 max.

$100

$50

$250

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½” plywood

Boarding

5/8” plywood

Boarding

¾” plywood

Screening

$.50 / UI

$.60 / UI

$.70 / UI

$.40 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Vehicle Removal

$25

$300

$375

$450

$525

$140

Variations from General Requirements

 

 

 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

5,000 s.f.

Initial Cut

5,001 to 10,000 s.f.

Initial Cut

10,001 to

15,000 s.f.

Recut

Up to

5,000 s.f.

Recut

5,001 to 10,000 sf.

Recut

10,001 to

15,000 s.f.

Trim Shrubs

Snow Removal

$45

$65

$85

$25

$35

$45

$40

$45

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units

Wet Heat: Steam Heat

1 Unit 

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$75

$35 / Unit

$120

$70 / Unit

$450

$115 / Unit

Variations from General Requirements

 

Note:  The cost of anti-freeze is included in the cost allowable.

 

97-31 Prices

$100

$100 / Unit

$100

$100 / Unit

N/A

N/A


 

PHOTOS

 

$1.00


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 
  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

Install a Kwikset No. 400T, key code 44535 or equivalent on front and rear entry doors.  Provide keys to the M&M contractor.  Replace cylinder in lock.  If necessary, replace door lockset in the existing bore.  If other doors are secure through being locked or bolted, even if keys are not available, do no other securing.  Do not use a slide installation, brace, or any other securing method, which may damage the woodwork or door.  The mortgagee will be held accountable for any damage caused by incorrect securing.  Garage and outbuildings should be secured through use of padlock and hasps unless a cylinder lock with key available is in place; do not rekey. 

 

Swimming Pools -

Do not drain in-ground pools.  Add 2 gallons of household bleach (e.g. Clorox or Purex) or chlorine to pool. A cover must be installed to prevent access.  Pool cover must be constructed with 6x6 wire mesh and 6 mil visqueen or polyurethane over 2 by 6 at 16 O.C.  Cover must be capable of supporting at least 50 pounds.  Fence doors/gates must be padlocked.  See page 20 of attachment 3 for diagram. 

 


 

Securing Cost Schedule

 
 

 

BOARDING

 

Use ½ inch plywood, cut to fit openings.  See plywood-boarding diagram on page 22, 23, 24 and 25. Diagrams on these pages indicate to use ¾” plywood for doors and 5/8” plywood for security doors.

 

When there is no primary entry door, install security door.  Construct door for main entrance (5/8 inch” plywood with hasp / padlock, and hinges.  See plywood boarded door diagram on page 23. If a swamp cooler is removed, board the opening without authorization from the M&M contractor to prevent interior damage.

 



 

Boarding Cost Schedule  
 
 

 

DEBRIS REMOVAL

 
NO VARIATION FROM GENERAL REQUIREMENTS.
 
Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 

A photograph of the front and rear yards is required “ before” and “after” the initial lawn cut and final lawn cut (when in season).

 

Only one initial cut per conveyance.

 
Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 

Winterization is required from September 1 through April 30.  Properties should be winterized only once unless otherwise directed by the M&M contractor.  Re-winterization may be required if the initial winterization is found unsatisfactory and the mortgagee obtains prior approval from the M&M contractor.

 

Type of Service:

Allowable Cost:

Sump Pump (1 Unit)

$10

Sump Pump (2 Units)

$20

Sump Pump (3 Units)

$30

Sump Pump (4 Units)

$40

 

Winterization Cost Schedule