PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Virginia |
$1,250 |
$1,750 |
$2,000 |
$2,250 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Temporary |
$200 |
$1.65/sq.ft., $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.60 / UI |
$.70 / UI |
$.80 / UI |
$.50 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$35 |
$420 |
$525 |
$630 |
$735 |
$120 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$55 |
$75 |
$95 |
$30 |
$40 |
$50 |
$45 |
$55 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$70 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$55 |
$35 / Unit |
$100 |
$80 / Unit |
N/A |
N/A |
$2.50
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Master Lock key code to 44535 on front and rear entry doors. On other secondary entry doors with existing deadbolt locks, rekey to lock type 44535. Where a lockset is not practical, use Master Padlock A389. Install slide bolt on any remaining secondary entry doors on the 1st floor.
Mortagees may use bracing to secure other doors leading to the exterior as needed. Specifically, bracing should be used only when exterior doors cannot be otherwise secured from the interior. If you have questions about when to employ bracing contact the M&M contractor.
Bracing - Cut a 2x4 inch brace board to fit between the interior doorknob and a cleat board nailed into the floor at a 45-degree angle.
Mortgagees must obtain prior approval from the M&M contractor prior to re-securing a property.
Swimming Pools:
Replace
any damaged or missing boards or sections of fence.
Remove all trash from interior of pool.
As necessary, build frame and cover pool with appropriate decking
or wire mesh in accordance and in compliance with State and local codes. Mortgagees do not need prior
approval to secure pools.
NO VARIATION TO THE GENERAL REQUIREMENTS.
Winterize year round regardless of the month the property is secured.