PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Pennsylvania |
$1,250 |
$1,750 |
$2,000 |
$2,250 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Temporary Roof Repairs |
$200 |
$1.65/sq.ft., $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½ plywood |
Boarding 5/8 plywood |
Boarding ¾ plywood |
Screening |
$.55 / UI |
$.65 / UI |
$.75 / UI |
$.45 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$35 |
$420 |
$525 |
$630 |
$735 |
$120 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$55 |
$75 |
$95 |
$30 |
$40 |
$50 |
$35 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$70 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$55 |
$35 / Unit |
$100 |
$80 / Unit |
N/A |
N/A |
$2.50
NO VARIATION TO THE GENERAL REQUIREMENTS.
There is a need to separately identify the requirements for the City of Philadelphia. Therefore, in the City of Philadelphia, install Hampton padlock code 802 on front entry doors, rear entry doors and on any other secondary entry doors. Secure garages and outbuildings using a Hampton 802.
Mortgagees must obtain prior approval from the M&M contractor prior to re-securing a property.
Swimming Pools:
Replace any damaged or missing boards or sections of fence. Remove all trash from interior of pool. As necessary, build frame and cover pool with appropriate decking or wire mesh in accordance and in compliance with State and local codes. Mortgagees do not need prior approval to secure pools.
Use of screws, including basement windows, to secure boards is prohibited except when securing casement or other fixed type windows. Written justification must be supplied when a method other than bolt boarding is used. 1/2-inch plywood is to be used with light holes cut in medium to large size boards. Boards are not to be pierced or overlap each other. Use 2-inch sheet rock screws every 7 inches. Boards are to be cut to fit within ¾ inch, of the opening. Do not overlap wood or cover side bricks.
Boarding is pre-approved in the following zip code areas, however, mortgagees must exercise judgment before boarding properties. Only board if property is in a high vandalism area and boarding is the only reasonable means to protect the security of the property.
17509 17512
17516 17517 17518
17527 17532
17536 17547 17550
17560 17563
17565 18101 18102
18103 18115
18117 19013 19023
19320 19335 19380 19401 19464
Per ML 2004-07 (and prior to March 12, 2004 per email from
Golden Feather)
Window openings in these zip codes are to be re-glazed and doors
must be installed in entryways of the building. Doors must be
secured by installing a hasp or eyebolt using the #5 Master lock
key code A389 on front and rear entry doors. Install a slide
bolt on any remaining secondary entry door on the first floor.
19104 19120 19121 19122 19124 19126
19131 19132 19133 19138 19139 19140
19141 19142 19143 19145 19146 19147
19148 19151 19153
Boarding Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule
Winterize year round regardless of the month the property is secured.