Back

Maryland

PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

**Additional Amounts for Wet/Radiant Winterizations:  If a property is located in a state where winterization is required, and the property has hot water heat, add $250 per unit.
 

Philadelphia HOC

1  Unit

2  Units

3  Units

4  Units

Maryland

$1,400

$1,900

$2,100

$2,400

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Maximum Allowable Securing Fee

In-Ground Pools

Above-Ground

Pools

Hot-Tub,
Jacuzzi, Spa

Temporary
Roof Repairs

$200

$1.65/sq.ft., $750 max.

$100

$50

$250

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½” plywood

Boarding

5/8” plywood

Boarding

¾” plywood

Screening

$.60 / UI

$.70 / UI

$.80 / UI

$.50 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Vehicle Removal

$35

$420

$525

$630

$735

$150

Variations from General Requirements

 

 

 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

5,000 s.f.

Initial Cut

5,001 to 10,000 s.f.

Initial Cut

10,001 to

15,000 s.f.

Recut

Up to

5,000 s.f.

Recut

5,001 to 10,000 sf.

Recut

10,001 to

15,000 s.f.

Trim Shrubs

Snow Removal

$60

$80

$100

$30

$40

$50

$45

$55

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units

Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$75

$35 / Unit

$120

$70 / Unit

$450

$90 / Unit

 Variations from General Requirements

 

Note:  The cost of anti-freeze is included in the cost allowable.

 

97-31 Prices

$55

$35 / Unit

$100

$80 / Unit

N/A

N/A


 

PHOTOS

 

$2.50

 


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 
  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

Locks for each entrance door, rear door, including all doors on 1st floor and basement should be changed using a standard lockset.  Use a Kwikset Master Lock key code 67767.  Where a lockset is not practical, use Master Padlock A389. Mortgagees may use bracing to secure other doors leading to the exterior as needed.  Specifically, bracing should be used only when exterior doors cannot be otherwise secured from the interior.  If you have questions about when to employ bracing contact the M&M contractor.

 

Swimming Pools:

Replace any damaged or missing boards or sections of fence.  Remove all trash from interior of pool.  As necessary, build frame and cover pool with appropriate decking or wire mesh in accordance and in compliance with state and local codes.  Mortgagees do not need prior approval to secure pools.

 

Mortgagees must obtain prior approval from the M&M contractor prior to re-securing a property.

 

Securing Cost Schedule

 
 

 

BOARDING

 

Use of screws, including basement windows, to secure boards is prohibited except when securing casement or other fixed type windows.  Written justification must be supplied when a method other than bolt boarding is used.  1/2-inch plywood is to be used with light holes cut in medium to large size boards.  Boards are not to be pierced or overlap each other.  Use 2-inch sheet rock screws every 6 inches.  Boards are to be cut to fit within ¾ inch of the opening.  Do not overlap wood or cover side bricks.

 

Boarding Cost Schedule  
 

 

DEBRIS REMOVAL

 
NO VARIATION FROM GENERAL REQUIREMENTS.

 

Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 
Approximate average lot size:  20x60

 

  Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 
Winterize year round regardless of the month the property is secured.
                                                                          

Winterization Cost Schedule