PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Atlanta HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Kentucky |
$1,000 |
$1,250 |
$1,500 |
$1,750 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub,
|
Temporary |
$200 |
$2.05/sq.ft., $1,200 max. |
$200 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.65 / UI |
$.75 / UI |
$.85 / UI |
$.50 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$30 |
$360 |
$450 |
$540 |
$630 |
$115 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$45 |
$65 |
$85 |
$30 |
$40 |
$50 |
$30 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$55 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$45 |
$45 / Unit |
$45 |
$45 / Unit |
N/A |
N/A |
$1.50
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Master Kwikset No. 400T, US-3, PK67767KD on front and rear entry doors. Where a lockset is not practical, use Padlock and Hasp (Master No. A-389). On other secondary entry doors with existing deadbolt locks, rekey to lock type 67767. Install slide bolt on any remaining secondary entry doors on the 1st floor.
Swimming Pools:
Secure in-ground pools. See pages 18 and 19 of attachment 3 for instructions.
Spas:
Secure above ground pool / Jacuzzi / hot tub. Prior approval not required
Exterior surface and edges of all plywood must be painted with one coat white primer and one coat white finish. Use of screws to secure panels to wood frame windows is prohibited.
There is no required thickness of plywood per the guidelines. Ensure that the thickness of plywood being used is documented on the update/bid and that the corresponding allowable amount is used for bidding/invoicing purposes.
Boarding Cost Schedule
NO VARIATION FROM GENERAL REQUIREMENTS.
Debris Removal Cost Schedule
Two before and two after photographs required for each lawn cut.
Requests to exceed cost limits for larger lots must be accompanied by lot dimensions and the calculated square footage of the lot.
Yard Maintenance Cost Schedule
1. Disconnect main water line at property side of meter. (Not applicable for State of Tennessee.)
2. Apply air pressure to water lines sufficient to remove all water.
3. Remove water from water heater, traps, and water closets.
4. Cap disconnected water line.
5. Place non-toxic antifreeze (minimum of one gallon per living unit or sufficient amount to prevent pipes from freezing) in all traps, toilet bowls, and water closets.
6. Failure to properly winterize property may result in mortgagee being liable for freeze damage.
7. Attach a "WARNING" sign at the kitchen sink, bath facilities and water heater, that at a minimum includes the following information:
WARNING
THIS PROPERTY SYSTEM WINTERIZED ON ______/______/____________
BY (NAME OF FIRM): _____________________________________________
PHONE NUMBER: _________________________________________________
DO NOT USE PLUMBING SYSTEM
WATER TESTING MUST BE ACCOMPLISHED WITHOUT DE-WINTERIZING SYSTEMS