PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Santa Ana HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Kansas |
$ 850 |
$ 900 |
$ 950 |
$1,000 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub,
|
Temporary |
$200 |
$1.65/sq.ft., $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.50 / UI |
$.60 / UI |
$.70 / UI |
$.40 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$25 |
$300 |
$375 |
$450 |
$525 |
$50 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$45 |
$65 |
$85 |
$25 |
$35 |
$45 |
$40 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$70 / Unit |
$450 |
$115 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$50 |
$70 / 2 Unit |
$90 |
$150 / 2 Unit |
N/A |
N/A |
$90 / 3 Unit |
$220 / 3 Unit |
$110 / 4 Unit |
$250 / 4 Unit |
$1.00
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Kwikset No. 400T, key code 44535 or equivalent on front and rear entry doors. Provide keys to the M&M contractor. Replace cylinder in lock. If necessary, replace door lockset in the existing bore. If other doors are secure through being locked or bolted, even if keys are not available, do no other securing. Do not use a slide installation, brace, or any other securing method, which may damage the woodwork or door. The mortgagee will be held accountable for any damage caused by incorrect securing. Garage and outbuildings should be secured through use of padlock and hasps unless a cylinder lock with key available is in place; do not rekey.
Swimming Pools -
Do not drain in-ground pools. Add 2 gallons of household bleach (e.g. Clorox or Purex) or chlorine to pool. A cover must be installed to prevent access. Pool cover must be constructed with 6x6 wire mesh and 6 mil visqueen or polyurethane over 2 by 6 at 16 O.C. Cover must be capable of supporting at least 50 pounds. Fence doors/gates must be padlocked. See page 20 of attachment 3 for diagram.
Use ½ inch plywood, cut to fit openings. See plywood-boarding diagram on page 22, 23, 24 and 25. Diagrams on these pages indicate to use ¾” plywood for doors and 5/8” plywood for security doors.
When there is no primary entry door, install security door. Construct door for main entrance (5/8 inch” plywood with hasp / padlock, and hinges. See plywood boarded door diagram on page 23. If a swamp cooler is removed, board the opening without authorization from the M&M contractor to prevent interior damage.
NO VARIATION FROM GENERAL REQUIREMENTS.
Debris Removal Cost Schedule
A photograph of the front and rear yards is required “ before” and “after” the initial lawn cut and final lawn cut (when in season).
Yard Maintenance Cost Schedule
Winterization is required from September 1 through April 30. Properties should be winterized only once unless otherwise directed by the M&M contractor. Re-winterization may be required if the initial winterization is found unsatisfactory and the mortgagee obtains prior approval from the M&M contractor.
Type of Service: |
Allowable Cost: |
Sump Pump (1 Unit) |
$10 |
Sump Pump (2 Units) |
$20 |
Sump Pump (3 Units) |
$30 |
Sump Pump (4 Units) |
$40 |