PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Philadelphia HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
District of Columbia |
$1,250 |
$1,750 |
$2,000 |
$2,250 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Maximum Allowable Securing Fee |
In-Ground Pools |
Above-Ground Pools |
Hot-Tub, |
Temporary |
$225 |
$1.65/sq.ft., $750 max. |
$100 |
$50 |
$250 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.60 / UI |
$.70 / UI |
$.80 / UI |
$.50 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Vehicle Removal |
$35 |
$420 |
$525 |
$630 |
$735 |
$120 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 5,000 s.f. |
Initial Cut 5,001 to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 5,000 s.f. |
Recut 5,001 to 10,000 sf. |
Recut 10,001 to 15,000 s.f. |
Trim Shrubs |
Snow Removal |
$55 |
$75 |
$95 |
$30 |
$40 |
$50 |
$45 |
$55 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$35 / Unit |
$120 |
$70 / Unit |
$450 |
$90 / Unit |
Variations from General Requirements
Note: The cost of anti-freeze is included in the cost allowable.
97-31 Prices |
$55 |
$35 / Unit |
$100 |
$80 / Unit |
N/A |
N/A |
$2.50
NO VARIATION TO THE GENERAL REQUIREMENTS.
Install a Master Lock key code to 44535 on front and rear entry doors. Install Kwikset Deadbolt Lock or equivalent, key coded to 44535 (3/4” solid bolt) on main entry door if door has an existing dead bolt lock. If existing padlock and hasp is on front or rear door, replace with Master Padlock A389.
Mortgagees may use bracing to secure other doors leading to the exterior as needed. Specifically, bracing should be used only when exterior doors cannot be otherwise secured from the interior (i.e. existing lock is not functional). If you have questions about when to employ bracing, contact the M&M contractor.
Bracing - Cut a 2 x 4 inch brace board to fit between the interior doorknob and a cleat board nailed into the floor at a 45-degree angle.
Mortgagees must obtain prior approval from the M&M contractor prior to re-securing a property.
Swimming Pools:
Replace any damaged or missing boards or sections of fence. Remove all trash from interior of pool. As necessary, build frame & cover pool with appropriate decking or wire mesh in accordance and in compliance with state & local codes. Mortgagees do not need prior approval to secure pools.
Use of screws, including basement windows, to secure boards is prohibited except when securing casement or other fixed type windows. Written justification must be supplied when a method other than bolt boarding is used. 1/2-inch plywood is to be used with light holes cut in medium to large size boards. Boards are not to be pierced or overlap each other. Use 2-inch sheet rock screws every 6 inches. Boards are to be cut to fit within ¾ inch of the opening. Do not overlap wood or cover side bricks.
Boarding Cost Schedule
Approximate average lot size: 50x100
Yard Maintenance Cost Schedule