Back

Caribbean

This area includes: Guam, Puerto Rico and The Virgin Islands

PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

**Additional Amounts for Wet/Radiant Winterizations:  If a property is located in a state where winterization is required, and the property has hot water heat, add $250 per unit.
 

Atlanta HOC

1  Unit

2  Units

3  Units

4  Units

Caribbean

$1,000

$1,250

$1,500

$1,750

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Maximum Allowable Securing Fee

In-Ground Pools

Above-Ground

Pools

Hot-Tub,
Jacuzzi, Spa

Temporary
Roof Repairs

$200

$2.05/sq.ft., $1,200 max.

$200

$50

$250

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½” plywood

Boarding

5/8” plywood

Boarding

¾” plywood

Screening

$.65 / UI

$.75 / UI

$.85 / UI

$.50 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Vehicle Removal

$30

$360

$450

$540

$630

$115

Variations from General Requirements

 

 

 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

5,000 s.f.

Initial Cut

5,001 to 10,000 s.f.

Initial Cut

10,001 to

15,000 s.f.

Recut

Up to

5,000 s.f.

Recut

5,001 to 10,000 sf.

Recut

10,001 to

15,000 s.f.

Trim Shrubs

Snow Removal

$45

$65

$85

$30

$40

$50

$30

N/A

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units

Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

N/A

N/A

N/A

N/A

N/A

N/A

 Variations from General Requirements

 

Note:  The cost of anti-freeze is included in the cost allowable.

 

97-31 Prices

N/A

N/A

N/A

N/A

N/A

N/A


 

PHOTOS

 

$1.50

 


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 
  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

Install a Master Kwikset No. 400T, US-3, PK67767KD on front and rear entry doors.  Where a lockset is not practical, use Padlock and Hasp (Master No. A-389).  On other secondary entry doors with existing deadbolt locks, rekey to lock type 67767.  Install slide bolt on any remaining secondary entry doors on the 1st floor.

 

Swimming Pools:

Secure in-ground pools. See pages 18 and 19 of attachment 3 for instructions.

 

Secure above ground pool / Jacuzzi / hot tub.  Prior approval not required

 

Spas:

 


Securing Cost Schedule

 
 

 

BOARDING

 

Exterior surface and edges of all plywood must be painted with one coat white primer and one coat white finish.  Use of screws to secure panels to wood frame windows is prohibited.

 

There is no required thickness of plywood per the guidelines. Ensure that the thickness of plywood being used is documented on the update/bid and that the corresponding allowable amount is used for bidding/invoicing purposes.                  

 

Boarding Cost Schedule
 
 

 

DEBRIS REMOVAL

 
One before and one after photograph is required for each room or outbuilding containing debris to be removed.

 

 
Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 

Lawn should be cut twice a month year round.  A photograph of the front and rear yards is required “before” and “after” the initial lawn cut and final lawn cut.

 
  Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 

DO NOT WINTERIZE.

 

Winterization Cost Schedule