Back

Long Beach, California

PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

**Additional Amounts for Wet/Radiant Winterizations:  If a property is located in a state where winterization is required, and the property has hot water heat, add $250 per unit.
 

Santa Ana HOC

1  Unit

2  Units

3  Units

4  Units

California

$1,000

$1,050

$1,100

$1,150

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Maximum Allowable Securing Fee

In-Ground Pools

Above-Ground

Pools

Hot-Tub,
Jacuzzi, Spa

Temporary
Roof Repairs

$275

$1.65/sq.ft., $750 max.

$100

$50

   $250

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½" plywood

Boarding

5/8" plywood

Boarding

¾" plywood

Screening

$.60 / UI

$.70 / UI

$.80 / UI

$.50 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Vehicle Removal

$30

$360

$450

$540

$630

$100

Variations from General Requirements

 


 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

5,000 s.f.

Initial Cut

5,001 to 10,000 s.f.

Initial Cut

10,001 to

15,000 s.f.

Recut

Up to

5,000 s.f.

Recut

5,001 to 10,000 s.f.

Recut

10,001 to

15,000 s.f.

Trim Shrubs

Snow Removal

$60

$80

$100

$30

$40

$50

$45

$55

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units

 Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$80

$35 / Unit

$125

$65 / Unit

$450

$90 / Unit

 Variations from General Requirements

 

Note:  The cost of anti-freeze is included in the cost allowable.

 

97-31 Prices

$75

$75 / Unit

$75

$75 / Unit

N/A

N/A


 

PHOTOS

 

$1.50

 


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 
  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

Per e-mail from Golden Feather on 7/25/02, use a 35241 lock code and an A336 padlock.

 

Replace front and rear door lock with new Kwikset or equivalent lock.  If other exterior doors cannot be secured with existing hardware, install a 4-inch heavy-duty barrel bolt.  Garages and outbuildings are to be secured by installing a hasp lock and securing it with a key operated padlock.  Turn off all utilities.  Contact utility companies to terminate service.

 

Swimming Pools:

Pools must be secured within 24 hours of discovery of the pool.  Comply with local laws and ordinances.  The costs for permits to drain pools/spas by local governments are included in the maximum limit and will be reimbursed based on the actual cost incurred.

 

Prior approval is not required to drain / secure swimming pools.

 

Type of Service

Allowable Cost

Pool Draining

$125

Pool and Spa Draining

$150

Spa Only

$  50

Lock Gates to Pool w/Padlock and Hasp

$  20

 

Securing Cost Schedule

 
 

 

BOARDING

 

Properties must be secured with window screens and security doors only.  Do not use plywood-boarding material to secure window openings.  See diagrams and specifications on pages 27, 28 and 29 (below).



 

This is a pre-approved screening area per e-mail from First Preston on 8/20/02.

 

Boarding Cost Schedule
 
 

 

DEBRIS REMOVAL

 

Mortgagees are not to perform any interior debris removal without specific M&M contractor approval. (This includes Interior H/Hazard removal per the email from Tracy Hager (MID) on 1/23/04.)

 

Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 

Grass should be cut year round.  One cut a month should be sufficient, however, two cuttings a month may be required after a rainy period. A photograph of the front and rear yards is required before and after the initial lawn cut and final lawn cut. 

 

Mortgagees will not be reimbursed for properties with desert landscaping except for weed removal.  Weed removal will be reimbursed as a recut.

 
  Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 

Winterize properties above 2,000 feet only.

 

  Winterization Cost Schedule