PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

**Additional Amounts for Wet/Radiant Winterizations:  If a property is located in a state where winterization is required, and the property has hot water heat, add $250 per unit.
 

 Maximum Allowable Cost Per Property

1  Unit

Maximum Allowable Cost Per Property

2  Units

Maximum Allowable Cost Per Property

3  Units

Maximum Allowable Cost Per Property

4  Units

$   700

$   850

$1,000

$1,150

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Maximum Allowable Securing Fee

In-Ground Pools

Above-Ground

Pools

Hot-Tub, Jacuzzi, Spa

Temporary Roof Repairs

$200

$2.05/sq.ft., $1,200 max.

$200

$50

$250

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½” plywood

Boarding

5/8” plywood

Boarding

¾” plywood

Screening

$.65 / UI

$.75 / UI

$.85 / UI

$.50 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable
for 1 Unit

Maximum Allowable
for 2 Units

Maximum Allowable
for 3 Units

Maximum Allowable
for 4 Units
 

Vehicle Removal

$30

$360

$450

$540

$630

$115

Variations from General Requirements

 


 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

5,000 s.f.

Initial Cut

5,001 to 10,000 s.f.

Initial Cut

10,001 to

15,000 s.f.

Recut

Up to

5,000 s.f.

Recut

5,001 to 10,000 sf.

Recut

10,001 to

15,000 s.f.

Trim Shrubs

Snow Removal

$45

$65

$85

$30

$40

$50

$30

N/A

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

 Dry Heat:

Additional Units

Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$75

$35 / Unit

$120

$55 / Unit

$450

$90 / Unit

 Variations from General Requirements

 

Note:  The cost of anti-freeze is included in the cost allowable.

 

97-31 Prices

$45

$45 / Unit

$45

$45 / Unit

N/A

N/A


 

PHOTOS

 

$1.50

 


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

  Preservation and Protection Cost Schedule
 
 

 

SECURING

 
Homeowners' keys must be provided to the local M&M contractor.
 
Install a Master Kwikset No. 400T, US-3, PK67767KD on front and rear entry doors.  Where a lockset is not practical, use Padlock and Hasp (Master No. A-389).  On other secondary entry doors with existing deadbolt locks, rekey to lock type 67767.  Install slide bolt on any remaining secondary entry doors on the 1st floor.
 
Swimming Pools:
Secure in-ground pools.  Secure above ground pool / Jacuzzi / hot tub.
 
  Securing Cost Schedule
 
 

 

 BOARDING

 
Only one trip charge may be made regardless of the number of windows.
 
Exterior surface and edges of all plywood must be painted with one coat white primer and one coat white finish.  Use of screws to secure panels to wood frame windows is prohibited. Follow instructions on page 20.
 
Page 20 indicates to use ½” exterior plywood on windows and doors.
 

 
Boarding Cost Schedule
 
 

 

DEBRIS REMOVAL

 
Contact the M&M contractor in writing for approval to remove health or safety hazards (furnish 2 bids).
 
  Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 
An initial cut is permitted year round.  Lawn should be cut twice monthly between March 1 and November 30.  A photograph of the front and rear yards is required “before” and “after” the initial lawn cut and final lawn cut.
 
  Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 
Electricity and utilities are to be turned off or disconnected unless approval to keep them turned on is obtained by the M&M contractor.  Do not disconnect water meter.  Use only non-toxic biodegradable materials.  Toilets must be cleaned before winterization materials are used.
 
  Winterization Cost Schedule