PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

Santa Ana HOC

1  Unit

2  Units

3  Units

4  Units

Oregon

$1,100

$1,250

$1,400

$1,550

 

Note:  If a property is located in a state where winterization is required, and the property has hot

water heat, add $250/unit 

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Secure One Unit

Secure In-Ground Pool (Sq. Ft. Amt.)

Maximum Allowable In-Ground Pools

Maximum Allowable Above-Ground

Pools

Hot-Tub, Jacuzzi, Spa

Maximum Allowable Lock Change/Securing

$40

$2.05

$1,050 max.

$110

$55

$350

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½ plywood

Boarding

5/8 plywood

Boarding

¾ plywood

Screening

$.80 / UI

$.90 / UI

$1.00 / UI

$.55 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Large Appliance Removal

Vehicle Removal

Pest Infestation

Tires

$40

$480

$600

$720

$840

$25

$125

$10

$15

Variations from General Requirements

 

 

 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

10,000 s.f.

Initial Cut

10,001 to 15,000 s.f.

Recut

Up to

10,000 s.f.

Recut

10,001 to 15,000 s.f.

 Snow Removal

Trim Shrubs

$100

$120

$95

$115

$55

$45

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units 

Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$75

$50

$130

$90

$460

$230

Variations from General Requirements

 


PHOTOS

 

Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.  


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 
  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

NO VARIATION TO THE GENERAL REQUIREMENTS. 

 

Securing Cost Schedule

 

 

 

BOARDING

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

Boarding Cost Schedule  
 
 

 

DEBRIS REMOVAL

 

More than 6 tires contact M&M

 

Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 

Turn water off at the street after winterization in all Santa Ana M&M contract areas, except Alaska.

 

Winterize from November 1 through March 31 only. However, heat system will remain in shut down mode.  Utilities are to remain off unless for the use of a sump pump.

 

Winterization Cost Schedule