PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Denver HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
North Dakota |
$1,100 |
$1,250 |
$1,400 |
$1,550 |
Note: If a property is located in a state where winterization is required, and the property has hot
water heat, add $250/unit
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Secure One Unit |
Secure In-Ground Pool (Sq. Ft. Amt.) |
Maximum Allowable In-Ground Pools |
Maximum Allowable Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Maximum Allowable Lock Change/Securing |
$40 |
$2.05 |
$1,050 max. |
$110 |
$55 |
$350 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.80 / UI |
$.90 / UI |
$1.00 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Large Appliance Removal |
Vehicle Removal |
Pest Infestation |
Tires |
$40 |
$480 |
$600 |
$720 |
$840 |
$75 |
$125 |
$125 |
$15 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 10,000 s.f. |
Recut 10,001 to 15,000 s.f. |
Snow Removal |
Trim Shrubs |
$85 |
$105 |
$80 |
$100 |
$45 |
$40 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$120 |
$50 |
$245 |
$90 |
$460 |
$230 |
Variations from General Requirements
Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.
NO VARIATION TO THE GENERAL REQUIREMENTS.
NO VARIATION TO THE GENERAL REQUIREMENTS.
NO VARIATION TO THE GENERAL REQUIREMENTS.
Boarding Cost Schedule
More than 6 tires contact M&M
Debris Removal Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule
Winterization is required from September 1 through April 30. Utilities and heat are to remain on.