PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Atlanta HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Illinois |
$1,400 |
$1,550 |
$1,700 |
$1,850 |
Note: If a property is located in a state where winterization is required, and the property has hot
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Secure One Unit |
Secure In-Ground Pool (Sq. Ft. Amt.) |
Maximum Allowable In-Ground Pools |
Maximum Allowable Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Maximum Allowable Lock Change/Securing |
$40 |
$2.05 |
$1,050 max. |
$110 |
$55 |
$350 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.80 / UI |
$.90 / UI |
$1.00 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Large Appliance Removal |
Vehicle Removal |
Pest Infestation |
Tires |
$40 |
$480 |
$600 |
$720 |
$840 |
$125 |
$155 |
$140 |
$15 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 10,000 s.f. |
Recut 10,001 to 15,000 s.f. |
Snow Removal |
Trim Shrubs |
$85 |
$105 |
$80 |
$100 |
$45 |
$30 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
$75 |
$50 |
$145 |
$90 |
$460 |
$230 |
Variations from General Requirements
Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.
NO VARIATION TO THE GENERAL REQUIREMENTS.
Preservation and Protection Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Illinois
Install cloth screening. Cloth screen first floor openings in zip codes:
60429 60426 60411 60466 60477 60443
Screening of wood windows is accomplished by framing the window with 2x2s. The screening is stapled over the frame and fastened with 1x2 furring laths.
Chicago, Illinois
Install Plywood boarding in the following pre-approved Chicago zip code areas following the Chicago boarding requirements below.
60608 60609 60610 60612 60615 60616
60617 60619 60620 60085 60621 60622
60623 60624 60627 60628 60636 60637
60643 60644 60649 60651 60653
Rule 1. All openings in a structure which may be accessed from ground level and/or within 8 feet in any direction of an exterior stairway, fire escape, ramp, porch or other exterior construction reachable from ground level or a public way should be secured to prevent entry by unauthorized persons. One building entrance should be secured with a door of either solid core wood or steel construction, having no window in the door, and the door should be securely locked to allow access only to authorized persons. Said door should be secured with a through-bolted hasp and padlock if the door swings in.
Materials
Rule 2. If plywood materials are used to secure buildings, such materials should be no less than 5/8-inch thick, exterior grade. Particleboard, wafer board, masonite or other similar materials should not be used for purposes of boarding-up a building.
Rule 3. Mechanical fasteners used for wood board-up materials should be round-head, non-slotted carriage bolts no less than 3/8-inch in diameter with washers and nuts on the interior face.
Installation Methods
Rule 4. The primary method of securing plywood boards should be by the use of through-bolt compression fastening, using plywood on the exterior face and wood bracing constructed of minimum 2-inch by 4-inch (nominal) lumber installed on the interior side of the opening to be secured, perpendicular to the long dimension of the opening. Such bracing should extend at least 6 inches beyond the edge of the opening on each side in order to be securely braced against the building structure.
Rule 5. Wood construction used to secure a building opening should contain at least one bolt in each corner and additional bolts no more than four feet on center continuously along the perimeter. Each bolt should fully penetrate the wood bracing on the interior side of the opening.
Rule 6. In the event that the through-bolt compression fastening is impossible due to the construction or condition of the opening, the opening should be covered with plywood secured with minimum 3-inch-long wood screws fastened on 4-inch centers around the circumference of the opening.
Boarding Cost Schedule
More than 6 tires contact M&M
Debris Removal Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule
Winterize year round, regardless of the month the property is secured. However, heat will remain in shut down mode. Utilities are to remain off unless required to operate a sump pump.