PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE

 

Atlanta HOC

1  Unit

2  Units

3  Units

4  Units

Illinois

$1,400

$1,550

$1,700

$1,850

 

Note:  If a property is located in a state where winterization is required, and the property has hot

water heat, add $250/unit 

Variations from General Requirements

 


 

LOCK CHANGE / SECURING SERVICE COST SCHEDULE

 

Secure One Unit

Secure In-Ground Pool (Sq. Ft. Amt.)

Maximum Allowable In-Ground Pools

Maximum Allowable Above-Ground

Pools

Hot-Tub, Jacuzzi, Spa

Maximum Allowable Lock Change/Securing

$40

$2.05

$1,050 max.

$110

$55

$350

Variations from General Requirements

 


 

BOARDING SERVICE COST SCHEDULE

 

Boarding

½” plywood

Boarding

5/8” plywood

Boarding

¾” plywood

Screening

$.80 / UI

$.90 / UI

$1.00 / UI

$.55 / UI

Variations from General Requirements

Note:

Key:  UI = United Inch

Definition - United Inch equals length plus width.

 


 

DEBRIS REMOVAL SERVICE COST SCHEDULE 

 

Per Cubic Yard

Maximum Allowable

for 1 Unit

Maximum Allowable

for 2 Units

Maximum Allowable

for 3 Units

Maximum Allowable

for 4 Units

Large Appliance Removal

Vehicle Removal

Pest Infestation

Tires

$40

$480

$600

$720

$840

$125

$155

$140

$15

Variations from General Requirements

 

 

 

YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE

 

Initial Cut

Up to

10,000 s.f.

Initial Cut

10,001 to 15,000 s.f.

Recut

Up to

10,000 s.f.

Recut

10,001 to 15,000 s.f.

 Snow Removal

Trim Shrubs

$85

$105

$80

$100

$45

$30

Variations from General Requirements

 


 

WINTERIZATION SERVICE COST SCHEDULE

 

Dry Heat:

1 Unit

Dry Heat:

Additional Units 

Wet Heat: Steam Heat

1 Unit

Wet Heat:

Additional

Units

Radiant Heat: Hot Water Heat

1 Unit

Radiant Heat:

Additional Units

$75

$50

$145

$90

$460

$230

 Variations from General Requirements

 


 

PHOTOS

 

Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.


 

Variations from General Requirements

 

PRESERVATION AND PROTECTION

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

  Preservation and Protection Cost Schedule
 
 

 

SECURING

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

Securing Cost Schedule

 

 

 

BOARDING

 

Illinois

Install cloth screening.  Cloth screen first floor openings in zip codes:  

60429       60426      60411      60466      60477      60443

 

Screening of wood windows is accomplished by framing the window with 2x2s.  The screening is stapled over the frame and fastened with 1x2 furring laths.

 

Chicago, Illinois

Install Plywood boarding in the following pre-approved Chicago zip code areas following the Chicago boarding requirements below.

 

60608              60609              60610              60612              60615        60616

60617              60619              60620              60085              60621        60622

60623              60624              60627              60628              60636        60637

60643              60644              60649              60651              60653

 

Rule 1. All openings in a structure which may be accessed from ground level and/or within 8 feet in any direction of an exterior stairway, fire escape, ramp, porch or other exterior construction reachable from ground level or a public way should be secured to prevent entry by unauthorized persons.  One building entrance should be secured with a door of either solid core wood or steel construction, having no window in the door, and the door should be securely locked to allow access only to authorized persons. Said door should be secured with a through-bolted hasp and padlock if the door swings in.

 

Materials

Rule 2. If plywood materials are used to secure buildings, such materials should be no less than 5/8-inch thick, exterior grade.  Particleboard, wafer board, masonite or other similar materials should not be used for purposes of boarding-up a building.

 

Rule 3. Mechanical fasteners used for wood board-up materials should be round-head, non-slotted carriage bolts no less than 3/8-inch in diameter with washers and nuts on the interior face.

 

Installation Methods

Rule 4. The primary method of securing plywood boards should be by the use of through-bolt compression fastening, using plywood on the exterior face and wood bracing constructed of minimum 2-inch by 4-inch (nominal) lumber installed on the interior side of the opening to be secured, perpendicular to the long dimension of the opening.  Such bracing should extend at least 6 inches beyond the edge of the opening on each side in order to be securely braced against the building structure.

 

Rule 5. Wood construction used to secure a building opening should contain at least one bolt in each corner and additional bolts no more than four feet on center continuously along the perimeter.  Each bolt should fully penetrate the wood bracing on the interior side of the opening.

 

Rule 6. In the event that the through-bolt compression fastening is impossible due to the construction or condition of the opening, the opening should be covered with plywood secured with minimum 3-inch-long wood screws fastened on 4-inch centers around the circumference of the opening.

 

Boarding Cost Schedule  
 

 

DEBRIS REMOVAL

 

More than 6 tires contact M&M

 

Debris Removal Cost Schedule
 
 

 

YARD MAINTENANCE

 

NO VARIATION TO THE GENERAL REQUIREMENTS.

 

  Yard Maintenance Cost Schedule
 
 

 

WINTERIZATION

 

Winterize year round, regardless of the month the property is secured.  However, heat will remain in shut down mode.  Utilities are to remain off unless required to operate a sump pump.

                                                                               

Winterization Cost Schedule