(Area includes: Guam, Puerto Rico and The Virgin Islands)
PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Atlanta HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
Caribbean |
$1,100 |
$1,250 |
$1,400 |
$1,550 |
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Secure One Unit |
Secure In-Ground Pool (Sq. Ft. Amt.) |
Maximum Allowable In-Ground Pools |
Maximum Allowable Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Maximum Allowable Lock Change/Securing |
$40 |
$2.05 |
$1,050 max. |
$110 |
$55 |
$350 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.80 / UI |
$.90 / UI |
$1.00 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Large Appliance Removal |
Vehicle Removal |
Pest Infestation |
Tires |
$50 |
$600 |
$750 |
$900 |
$1,050 |
$130 |
$190 |
$35 |
$15 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 10,000 s.f. |
Recut 10,001 to 15,000 s.f. |
Snow Removal |
Trim Shrubs |
$85 |
$105 |
$80 |
$100 |
N/A |
$30 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat: 1 Unit |
Dry Heat: Additional Units |
Wet Heat: Steam Heat 1 Unit |
Wet Heat: Additional Units |
Radiant Heat: Hot Water Heat 1 Unit |
Radiant Heat: Additional Units |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
Variations from General Requirements
Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.
NO VARIATION TO THE GENERAL REQUIREMENTS.
NO VARIATION
TO THE GENERAL REQUIREMENTS.
Exterior surface and edges of all plywood should be painted with one coat white primer and one coat white finish. Use of screws to secure panels to wood frame windows is prohibited. Additionally, boarding is pre-approved in the following zip code areas:
00923 00924 00929 00601 00602 00603
00703 00704 00705 00610 00612 00714
00616 00617 00794 00915 00956 00957
00959 00961 00622 00623 00725 00627
00729 00920 00921 00979 00982 00983
00985 00986 00987 00962 00736 00735
00935 00638 00739 00769 00782 00907
00783 00780 00926 00646 00647 00738
00650 00934 00652 00653 00784 00656
00965 00966 00967 00968 00969 00970
00971 00778 00659 00917 00660 00791
00662 00913 00664 00795 00777 00667
00669 00670 00771 00772 00911 00773
00674 00909 00606 00707 00680 00715
00676 00687 00718 00719 00720 00723
00624 00716 00717 00728 00730 00731
00734 00740 00741 00678 00677 00745
00925 00926 00927 00637 00688 00952
00751 00690 00683 00685 00757 00907
00909 00911 00912 00913 00953 00949
00976 00641 00692 00693 00901 00765
00766 00767 00698
EXCEPTION: There is no pre-approved boarding in ANY gated community within these zip code areas.
Boarding Cost Schedule
More than 6 tires contact M&M
Debris Removal Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Do NOT winterize.