PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Santa Ana HOC |
1 Unit |
2 Units |
3 Units |
4 Units |
California |
$1,100 |
$1,250 |
$1,400 |
$1,550 |
Note: If a property is located in a state where winterization is required, and the property has hot
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Secure One Unit |
Secure In-Ground Pool (Sq. Ft. Amt.) |
Maximum Allowable In-Ground Pools |
Maximum Allowable Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Maximum Allowable Lock Change/Securing |
$40 |
$2.05 |
$1,050 max. |
$110 |
$55 |
$350 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½" plywood |
Boarding 5/8" plywood |
Boarding ¾" plywood |
Screening |
$.80 / UI |
$.90 / UI |
$1.00 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable for 1 Unit |
Maximum Allowable for 2 Units |
Maximum Allowable for 3 Units |
Maximum Allowable for 4 Units |
Large Appliance Removal |
Vehicle Removal |
Pest Infestation |
Tires |
$40 |
$480 |
$600 |
$720 |
$840 |
$88 |
$120 |
$75 |
$15 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 10,000 s.f. |
Recut 10,001 to 15,000 s.f. |
Snow Removal |
Trim Shrubs |
$100 |
$120 |
$95 |
$115 |
$55 |
$45 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat 1 Unit |
Dry Heat Additional Units |
Steam Heat 1 Unit |
Steam Heat Additional Units |
Wet/Radiant Heat 1 Unit |
Wet/Radiant Heat Additional Units |
$75 |
$50 |
$130 |
$90 |
$460 |
$230 |
Variations from General Requirements
Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.
NO VARIATION TO THE GENERAL REQUIREMENTS.
NO VARIATION TO THE GENERAL REQUIREMENTS.
More than 6 tires contact M&M
Debris Removal Cost Schedule
Grass should be cut year-round. Properties with desert landscaping require only once a month weed removal and are reimbursed as a re-cut.
Winterize properties above 2,000 feet only. However, heat system will remain in shut down mode. Utilities are to remain off unless required to operate a sump pump.
Winterization Cost Schedule