PRESERVATION AND PROTECTION OVERALL MAXIMUM COST SCHEDULE
Maximum Allowable Cost Per Property 1 Unit |
Maximum Allowable Cost Per Property 2 Units |
Maximum Allowable Cost Per Property 3 Units |
Maximum Allowable Cost Per Property 4 Units |
$ 800 |
$ 950 |
$1,100 |
$1,250 |
Note: If a property is located in a state where winterization is required, and the property has hot
Variations from General Requirements
LOCK CHANGE / SECURING SERVICE COST SCHEDULE
Secure One Unit |
Secure In-Ground Pool (Sq. Ft. Amt.) |
Maximum Allowable In-Ground Pools |
Maximum Allowable Above-Ground Pools |
Hot-Tub, Jacuzzi, Spa |
Maximum Allowable Lock Change/Securing |
$40 |
$2.05 |
$1,050 max. |
$110 |
$55 |
$350 |
Variations from General Requirements
BOARDING SERVICE COST SCHEDULE
Boarding ½” plywood |
Boarding 5/8” plywood |
Boarding ¾” plywood |
Screening |
$.80 / UI |
$.90 / UI |
$1.00 / UI |
$.55 / UI |
Variations from General Requirements
Note:
Key: UI = United Inch
Definition - United Inch equals length plus width.
DEBRIS REMOVAL SERVICE COST SCHEDULE
Per Cubic Yard |
Maximum Allowable |
Maximum Allowable |
Maximum Allowable |
Maximum Allowable |
Pest Infestation |
Tires |
Large Appliance Removal |
Vehicle Removal |
$45 |
$540 |
$675 |
$810 |
$945 |
$150 |
$15 |
$140 |
$180 |
Variations from General Requirements
YARD MAINTENANCE SERVICE REQUIREMENTS AND COST SCHEDULE
Initial Cut Up to 10,000 s.f. |
Initial Cut 10,001 to 15,000 s.f. |
Recut Up to 10,000 s.f. |
Recut 10,001 to 15,000 s.f. |
Snow Removal |
Trim Shrubs |
$70 |
$90 |
$65 |
$85 |
$0 |
$30 |
Variations from General Requirements
WINTERIZATION SERVICE COST SCHEDULE
Dry Heat 1 Unit |
Dry Heat Additional Units |
Steam Heat 1 Unit |
Steam Heat Additional Units |
Wet/Radiant Heat 1 Unit |
Wet/Radiant Heat Additional Units |
$90 |
$50 |
$140 |
$90 |
$460 |
$230 |
Variations from General Requirements
PHOTOS
Flat fee reimbursement of $30.00 for photographs, regardless of the number of pictures.
NO VARIATION TO THE GENERAL REQUIREMENTS.
Preservation and Protection Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Securing Cost Schedule
Boarding Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Yard Maintenance Cost Schedule
NO VARIATION TO THE GENERAL REQUIREMENTS.
Winterization Cost Schedule